El Director
Veteran
The all nighter thing seems to be working. I now have about 16 minutes left to cut. If I can keep the pace I've been working at, it should only take me four hours. Yes, I cut that fast. Get over it. =) But seriously, it feels great to know that I'll be caught up. My producer has ordered two $900 mics, two stands, and a mixer for ADR purposes. With the new equipment, I'll be able to adopt a more "industry standard" workflow, meaning, that the ADR will be synced as soon as we're done recording, rather than me having to sync it at a later time. I'm super stoked for that! So yeah, we're still on track for a Thanksgiving premiere, and having DVD's for everyone in time for the holidays. =)