I've no reason to believe it won't ship in October, never said anything else. But for such to happen it's likely they must be gearing up for full production NOW, it may even have started. As such, they need to have finalised the basic design to enable tooling up the production line - which means most of the final design must also be fixed. What I'm therefore saying is that any changes suggested via feedback NOW will only be able to be implemented if they're relatively straightforward.Keep in mind that unlike Blackmagic, or AJA's CION, or even the Reds, you never hear of Panasonics being two, three, four, six, or 10 months late to market. Back in April they said it'd ship in October, and it'll ship in October. They know what they're doing.
The impression I had was that these results were from early production models - which ties in with the timescale I'd expect - not "hand-built prototypes". They'd have to be if Panasonic are to meet their own timelines.
It's the handbuilt prototypes that I'd expect the basic feedback from, and I'd expect that to have happened a few months ago - before Noel got access. That would have to be the case to give time to implement the feedback into the design well before any production line started to be built.How can they possibly get feedback before they've even built the first hand-built prototype? The Engineering Sample that Noel had a couple of weeks ago is the very first one made. What these people used is the second iteration, only a couple of weeks later.
I believe the typical time from conception to shipping of a product like this is somewhere between 1 and 2 years, and first prototype likely to be about half way through that cycle. But the only people to know about it being under very strict NDA. What's likely to be happening now is "bug-fixing" of the early production run.