fieldreportermf
Active member
Hello All,
I'm an FCP 7 user and having a problem with sequence settings. I have a finished project and the client wishes to break the project up into smaller segments. i've added a new sequence to the existing project, then simply copied the footage from the original sequence to the new one. My problem is that once I drop the footage into the new sequence, the parameters( size, aspect ratio, etc) are not retained. Can anyone suggest what I may be doing wrong? Many thanks...
I'm an FCP 7 user and having a problem with sequence settings. I have a finished project and the client wishes to break the project up into smaller segments. i've added a new sequence to the existing project, then simply copied the footage from the original sequence to the new one. My problem is that once I drop the footage into the new sequence, the parameters( size, aspect ratio, etc) are not retained. Can anyone suggest what I may be doing wrong? Many thanks...