FEATURE: Rise of the Beast-the new feature from STARS Pictures

28676_124078994295628_104346386268889_124834_3236298_n.jpg

Would that happen to be based on the Fox Business Channels graphics?
 
@ Andrew: I'm not sure. It's a modified template that Andrew Kramer posted.
@ Nate: When I'm done filming. I might cut a footage only teaser to some music. Then I don't have to listen to people complain about the in camera audio.
 
People just like to point out how bad it is. Didn't you get a seperate audio device?

I know one thing. I wouldn't trade my H4N for the world.
 
Didn't you get a seperate audio device?
Nope. I'm doing ADR for the entire film. We shoot with just the camera mic, using it as a scratch track. A few weeks after filming, once I have picture lock, we'll rerecord all the lines. With my style of editing, syncing separate audio is more hassle than ADR, plus, it'd mean having to find a good boom op, and equipment.... This just works better for me. =D
 
I had some fun today dropping in some music from Bourne into my rough cut. I'll probably use it as a temp track when I bring both composers on board.
 
And when you bring them in you can specify that you want it to sound as close to the Bourne music without getting sued. LOL. I'm really excited about this project. It sound like it's going to be a winner. I'm experimenting with Keylight and AE right now as well as adding the finishing touches to the script. I can't wait to see the trailer. I think what you may want to do is find a trailer you like and cut your next trailer to that one. That's how I'm starting to do it. It's hard to get it right.

-Nate
 
The fact that you ADR your entire film after the fact gives makes me feel better about the little bit of ADR we are going to have to do. There were some scenes where the acting just wasn't there in terms of tone, the facial expressions are good but the tone of their voice doesn't match. ADR should be able to fix that.
 
I think what you may want to do is find a trailer you like and cut your next trailer to that one.
Good idea! It worked for El Mariachi back in the day, so why not?

The fact that you ADR your entire film after the fact gives makes me feel better about the little bit of ADR we are going to have to do. There were some scenes where the acting just wasn't there in terms of tone, the facial expressions are good but the tone of their voice doesn't match. ADR should be able to fix that.
It should be able to. ADR really isn't that bad. I don't know why there's a fear of it. To do all of an actors lines takes me about three hours with that actor. That includes recording and syncing.
 
Okay Nate, this one's for you.

Monday, August 16, 2010
Day 11.
Finally, our last day of shooting at my apartment! Tomorrow, once I’ve cut the footage together and made sure it all looks good, I’m putting my place back to normal. That means cleaning and putting all my stuff back up. =)


Anyway, on to the good stuff. We had a very good night of filming. I had my main Leap crew and two extras arrive at 8:30pm. First on our list was the scene where a Sweeper Team storms the crew’s apartment. We dressed up the two extras to look like SWAT and Alex (Shane) played a third as well. I felt bad for my main crew having to wait for us to shoot the Sweeper stuff, but I didn’t know how long it would take and I wanted to be able to continue shooting nonstop tonight. Oh, and we had a crowd watching. I had gone outside to see if any neighbors were around so I could warn them not to freak out when SWAT with guns were running through the complex and kicking in my door. There were a few people outside and the wanted to watch and take some camera phone video. I told them I had no problem with that as long as they stayed out of my shots. Some of them even called their friends to tell them that an action movie was being shot in our complex. Filming went off perfectly and no cops were called. As Courtney says in the film, “It’s always a good day when you stay out of jail”. Oh, and one of my SWAT looks just like Stalone! I made sure to frame him with very Stalone-esque angles. For the shot where the door is kicked in, we filmed it from the outside with the door just barely closed. Where the door hits the wall, I had placed my couch cushion to keep the wall safe.
After we dismissed the SWAT guys, Alex changed into his Shane costume and we filmed the Leap crew evacuating the apartment. Next on the list was some reshoots of Crystal’s conversion scene. After Chelsea (Crystal) left, we shot our last apartment scene before ending the night with Rachel (Theresa)’s detention.


Some other notes: Besides the term, “detention”, another thing I’ve said alot on this picture is “It’s not that kind of movie”. I must have said it a bunch because I actually had actors beating me to it last night. Awesome! Also, I given up on trying to keep track of scenes and setups. We’re moving so fast that I can’t even keep track anymore, plus a lot of the time we’re shooting half scenes. How on earth do you record something like that in the daily logs? So now I’m down to just keeping track of when we start/end, who’s working, where, and how much footage. If I have an assistant on the next flick, they can do the paperwork.



45856_140315492671978_104346386268889_184639_5290419_n.jpg

44628_140315519338642_104346386268889_184640_2736184_n.jpg

44727_140315659338628_104346386268889_184644_6763609_n.jpg

40828_140315692671958_104346386268889_184645_163659_n.jpg
 
Last edited:
Thanks for that. That last pic rocks. LOL. Great looking SWAT team. Are you going to do the old clone trick and have a massive squad break in and run all over the place. I think that would surprise everyone when they see it.

-Nate
 
Back
Top