Hi
we are at stage of the lay-back. the project was shoot and edited at 720 60fps(59.97) on FCP 6.01. The sound was recorded and edited at 29.97 non-drop frames.
as broadcast requirements the project must be delivered at NTSC drop frames on digibeta. for sake of synch between pic and sound what is the best way to convert this project to drop frame?
when the editor changed the timeline to drop-frame the project was 3:04 longer (3:18 for every hour)
best
berk
we are at stage of the lay-back. the project was shoot and edited at 720 60fps(59.97) on FCP 6.01. The sound was recorded and edited at 29.97 non-drop frames.
as broadcast requirements the project must be delivered at NTSC drop frames on digibeta. for sake of synch between pic and sound what is the best way to convert this project to drop frame?
when the editor changed the timeline to drop-frame the project was 3:04 longer (3:18 for every hour)
best
berk