Filming in One Hour

eureka

Well-known member
Hi Guys

Im nervous..
Doing a TV Commercial for a Bowling Centre Chain in about One hour.
Storyboard ready, Lights Ready, P2 Cards empty, Battery Charged..

Any last minute advice....
 
Don't even think about walking out on the lane to get the shot looking back at the bowler. It is crazy how slippery it is. I almost wiped out with a DigiBeta on my should a few years back.

Oh, and have fun.
 
filmstox said:
Don't even think about walking out on the lane to get the shot looking back at the bowler. It is crazy how slippery it is. I almost wiped out with a DigiBeta on my should a few years back.

Oh, and have fun.

Lay down on a blanket and have people in the gutters guiding you. That surface is crazy slick . . .

Good luck.
 
Don't rest your camera on the ball return ramp...

Wear clean undies, cause you never know when you'll get arrested...
 
thanks for all the sound advice, unfortunatly, I read these messages after i did the gig.
It turned out really well, started at 7.30pm finished @ 1am...
And still not done.
Im trying to upload the edited first cut footage, I seem to be having issues uploading..Am i doing something wrong?
.mov file 5mb

cheers
 
Save out as Self-Contained QT movie. Open in QT Player, resize to a good Internet size, at least half the original size. Then Export as H.264, Frame Rate and Data Rate set to Automatic, Quality set to Medium (low to medium will still give pretty good image), Size to Current. Turn on Frame Reordering, and Encode at Best Quality.
 
Back
Top