DAY BY DAY - Panasonic, P&S Tecknik, Nikon Primes

SUPPATIME

Active member
Some of you guys may recall my day-by-day posting for "Dearheart's Bakery"... well, I'm at it again on a smaller scale. I'm currently DPing a short film entitled "Emotion", about a power-tripping young police officer and his compulsively cheating spouse.

For this, I essentially have a 1-Ton grip truck with the following:

1200W Desisti HMI and ballast
1200W PAR HMI and ballast
ARRI 4 Light Kit - 300W and 600W
ARRI 3 Light Kit - 600W and 1000W
Mole Richardson 1K
Kino Flo 4-Bank and ballast
Chapman/Leonard Super PeeWee II Hydraulic Dolly
Ultrascope Mark 1 Geared Head
O'Connor Fluid Head and Sticks
Car Mount Kit
Magic Box Flicker Generator
Assorted Clamps
Assorted Gels and Diffusions
Assorted Flags, Nets and Silks
6x6 Frame with Griff


I know I'm forgetting some of the stuff that's on the truck... but I've only gotten 6 hours of sleep in the past 50 hours or so.

In all honesty, it's been a disaster so far. Somehow, our check-outs got screwed up, so I ended up picking up the truck and running over to Hollywood Rentals to pick up the car-mount kit. Keep in mind, I was informed that I was to pick these things up at 10:00AM on Monday... and we were to start setting up for the shoot at 3:30PM. I was okay with doing it, but it would have been nice for some forewarning at least a day ahead of time.

The bulk of our gear checkout was at 2:00PM, and I assume you can see my dismay: checkout started at 2:00PM, and we were supposed to be setting up at 3:30PM. I was one of three people at the actual checkout, and they scrambled to pack the truck as I tested all of the lights... some of which did not work. They had to be swapped out and new paperwork had to be filed. I didn't even get to test any of the other gear, such as the Super PeeWee II dolly or make sure any of the other departments' gear was there. We actually thought we were missing the entire sound package until someone found it tucked away. Either way, I was furious that I had to take care of all of this when this responsibility should have been shared with other departments.

Second, I get a call asking me if I could also pick up tape stock. Here I am with a half loaded truck at 3:00PM and I had to say no. So I gave the guy this company's phone number to get the tape stock this camera needs (as the tapes you get at Best Buy aren't the best for the Panasonic cameras). He shows up to set at 4:00PM with Sony tapes from Best Buy anyway... and then we realize he has not purchased DAT tapes. Now we're running sync sound right into the camera. And the director is frustrated with me because of this?

The first set of scenes were the sex scenes. I felt bad for the actors there, as soon as they meet the crew they are taking their clothes off and screwing on a kitchen countertop. I've worked with the lead female talent, and she's one of the most amazing actors I've ever met. But still, there were 15 people in the room when all of this was going on, and I felt kind of bad about it. At least everyone had a good sense of humor about it.

I was told to throw a shadow across the kitchen cabinets. This shadow would be both actors during their sexual act, and the camera was to start on the cabinets and dolly out to the action, showing a practical in the shot that would explain why there was a shadow.

We laid 16 feet of straight track and lifted the 400lb Super PeeWee II onto it, then set up the camera. I know it loses a lot of light, but I'm loving the P&S Tecknik. I've had the option to use the PRO one before an a CineAlta, and love that even more. Anywho, once we had the camera set, I went to lighting the scene. Our practical source was a set of two small candles on the countertop. To fake the throw of those candles, we positioned one of the ARRI 1K fresnels on a homemade stand and attached it to the Magic Box flicker generator and put full CTO over it. This gave it a nice warm glow that cast a relatively defined shadow 15 feet away on the opposite wall. We added some fill to the scene and actor's faces and bodies with 2 lights on the 4 Bank Kino with tungsten balanced bulbs. We also diffused that with shower curtain. Yep, no fancy numbers like 216 or 250... Lee doesn't even make the crap... it's a simple shower curtain. You can buy 108310891246 of them at Bed, Bath and Beyond.

We also put 2 of the tungsten balanced Kino bulbs in the overhead kitchen fixtures. The Kino bulbs fit perfectly into standard fluorescent fixtures, and produce a prettier, brighter light. You might even want to do that in your house, if you can purchase the bulbs. Hell, I would. We stopped the camera down some to make this already hot scene look a little lower key. Its nice, because with all of that light, you have everything lit fairly evenly and have the option to stop down without losing most of your information in your shadows. Stopping down also meant that we didn't have to pull focus on our 14mm lens.

The last setup in this location was another lovemaking scene (I wouldn't even call the last one "lovemaking" if you get my drift) in the bedroom. We lit this very sparingly as well, with the 1200W Desisti HMI on full wide outside the window and about 10 feet in the air. The blinds were closed, but it cast this etherial glow, illuminating the edges of the window frame and some of the edges of the bed and skin of the talent. We then threw a sandbag on the short end of the gobo arm on a C-Stand and put the 4-Bank Kino directly above the bed, also with daylight balanced bulbs, but this time with 1/2 CTB and some 250 diffusion. That stuff is my personal favorite because I feel it diffuses the light the most evenly.

We kicked a very small amount of light into our lead female's eyes to illuminate her reaction when the male talent told her he loved her. I love using Kinos for two purposes: to evenly light a background in a very shallow area (meaning there isn't a great distance to throw the light to get an even look) and for throwing right above talent, to create a uniform rim light, or in this case, to accentuate body lines.

I've come from the world of fashion photography and love the human form. I'm a straight guy, but anyway you can accentuate a male or female's curves is very sexy. For girls, it's all in the lower back and hips... for guys, it's all in the shoulders and stomach. The 4-Bank Kino did just that in this sequence, and the male talent takes his time kissing up the back of the lead female talent until he reaches her ear and says his lines. Over all, the Director was very pleased with how this lighting setup turned out.

After another 45 minutes for a setup, we had a jib over the bed for the last shot of the female talent and the Police Officer character. They were in bed together cuddling and exchange dialogue. We had small mishap because the jib swung around and struck the Kino, but luckily no one got hurt when it fell on the bed and the camera and lighting fixtures were all fine as well. The jib from the foot of the bed to a medium shot of the young lovers simply looks great. I was even impressed... and I'm hard to impress. That's why I don't have a girlfriend at the moment.

Day One went off pretty well... we started off very late because of the aforementioned problems that arose, but we ended up wrapping only 30 minutes after our scheduled departure time. When I get my hands on some of the raw footage, I'll post stills.

For as much as I'm bitching about this, the images look amazing. Some people had emailed me drooling over being able to use Panavision Super Speeds on the last show I did and posted about here, but honestly, those lenses are giant pieces of crap. I'm getting better images using 5 Nikon 35mm SLR lenses than I did with a $100,000 array of the Panavision ones. My Nikon lenses are the following:

14mm Nikkor f2.8
50mm Nikkor f1.8
85mm Nikkor f1.4
70-200mm Nikon f3.5
28mm-200mm Nikon f3.5

I'll end this post and begin a new one on Day Two.

Mods, when I start posting images or clips from in-camera, please move this to the Screen Grabs / Clips section.
 
Last edited:
Okay, so this is where it gets interesting.

Day Two, we're shooting the beating sequence. The Police Officer has his spouse handcuffed to a chair and is screaming at her and beating her.

We started off with another location that was absolutely a dream. It was an abandoned mechanic's shop, complete with everything left there since 1988. There was even a Ford Bronco on blocks without an engine.

For some reason, against the wishes of both the Producer and myself, we opted not to shoot at this amazing location (for need of a generator) and instead went for a horse stable that one of the employees of the farm lived directly above. This means running water, the washer and dryer and footsteps were constantly an issue for sound.

After setting up and lighting for the first shot, I was quickly told that what I had done was all wrong--which was fine--but our communication was poor, as I had lit for what the director had told me to. It turns out, my positioning of the talent to the background was entirely wrong.

We then had to have a long meeting where I explained to the Director that the location he wanted the talent in wouldn't allow him to get nearly a third of the shots he wanted, because there were walls behind talent that could not be moved. Even if we cheated the talent forward, I explained, the shots would look like ****.

After a discussion between the 1st AD, Director and I, we opted to try the lighting setup the way I was originally lighting for. The only problem is that I already had my team light for what the Director wanted... so we had to switch it back. This wasted 3 hours.

I'm extremely greatful that the Director trusted my instinct and went with the backdrop and staging that I had thought was originally in his overheads (which we obviously had a major miscommunication about). The shots we managed to get looked amazing.

The key lighting was done by building a 12 foot grid over the actor's heads where we hung the MR 1K dead overhead with no diffusion. This created extremely harsh shadows on our female lead's face (think The Godfather) and the background was lit with a combination of HMIs (1200W Desisti creating a rim and a hot spot on the wooden wall where a hose was dripping water... awesome!) and the 4-bank Kino with daylight balanced bulbs and shower curtain as diffusion.

We go ahead and shoot the lead female's coverage, and time-and-time-again, I ask "Do we have any more shots we can get from this angle with this lighting setup?" and I get the same response, "No, we can move on."

Well, we had a rediculously high number of shots to get for the day (nearly 35 I believe), and guess what? When you move all of your lights and strike gear while getting ready for another setup, it's not so easy to return the camera to the same spot again to get another mastershot that we could have gotten hours ago when the lights were set up illuminating the background.

We wrapped 6 hours late on an already 10 hour day and only got half of the coverage we needed. We now need to reacquire rights to shoot at this location on a pick-up day (we already have one pick-up day scheduled... now we need two) to finish covering the Police Officer's dialogue and movement.

We had a meeting at 7AM today (right after we wrapped) and discussed how horrible our communication was. We discussed meeting up early and knocking out a game-plan on how to shoot tonight's footage, and not run into a scenerio where we have to relight something we already had lit hours earlier so we can get one measly shot we could have knocked out a long time ago.

Newer filmmakers: your lives will be easier if you start covering your scenes in wide masters, and progressively move into mediums, close-ups, ECUs and then insert shots. If you go out of that order, or are afraid to run through scenes that are out of order, you need to understand that your crew will become horribly frustrated, and you won't come anywhere near making your day, shot-wise.

I woke up today at noon to my downstairs neighbors being loud, and here I go, taking a shower and going to my production meeting at 4:30. We start shooting again tonight at 6:00PM, and I get to use the car mount. I have no clue how to set up the car mount.

This should be another interesting night that I get to drive HOME from work during morning rush hour traffic.
 
Last edited:
Day Three:

It's official... I don't believe in the crap, but the set is cursed. I get to the production meeting between the Director, 1st AD and Producers to find that one of the producers got in a car accident earlier in the day. He hit some woman from behind... I assume he was tired from the night before. His airbags both deployed and the car is pretty messed up, but luckily both he and the lady he hit are fine.

We came up with a gameplan to get all of the shots we needed, but still, we fell behind. I attribute that to the continuing poor communication between the Director and I. I have trouble understanding his terminology when it comes to what he's looking for within a shot. He's extremely visually oriented, but does not communicate that in "camera lingo". It makes it extremely difficult to move ahead in a timely fashion. Also, most of our dwindling crew members are inexperienced, and I spend more time telling them what equipment I'm looking for than if I were to have gotten it for myself. I was once in that position so I am very patient with all of them, but for a low budget film, there are really only 5 of us doing the bulk of the work, and it's very frustrating.

Next on our "we're cursed" list was the generator. We got to our first location 2 hours late today (why, I have no idea... most of us were ready to go at call time... 6PM) and we couldn't get the genny started. Again, after I had to do it myself, we were up and running.

We got the cheapest generator possible because of budgetary constraints, and I could tell the Director was frustrated when I explained to him why we couldn't have more lights on this pitch-black country road. We were near the one circuit's maximum amperage with the PAR HMI and 4-Bank Kino. We only had one circuit for edison outlets... the rest were that b.s. you plug your home drier into. We did not have any adapters.

So, I quickly realize that the exterior night location sucks. When I heard we had a permit to shoot on this street in the middle of nowhere, I had foolishly assumed we had police supervision and had the street shut down for 4 hours. Not the case at all. As we're setting up lights where the action is going to be, cars are whizzing by us at 50 mph. It was EXTREMELY dangerous. The Director also wanted me to lay track from the back of a stopped car out into the middle of the road for a dolly sequence... I simply told him no. I would have loved to get that shot if we had the street shut down, but we did not, and I refused to jeopardize a $300,000 dolly, track, and myself.

So the car is supposed to come to a screetching halt right in this paticular spot, and our amateur stunt guy just wasn't getting it up to speed. I'm a weekend autocrosser (for you car nuts out there) so I asked if I could have my AC run camera and I give it a go. Two takes later, we've got me at 40 mph spinning the car sideways down this straight road with 6 foot ditches on both sides. I won't lie and say I wasn't scared, but I got exactly what we were looking for and it was fun in the mean time. I got to take some of my on-set frustration on the brakes and tires of a new car.

Let's see... what went wrong next? At my discression, we do a company move to a safer, quieter location for the MCUs and CUs. We blow out one of our big lights (if you can even call them that) as soon as we get there, and I have to work around my original lighting intent. The good news is that while trying to figure out a new way to light the exterior car stuff, I came up with something I'm most proud of... you'll see it below.

So here we are in the parking lot of an apartment complex... all the way in the back corner, out of nearly everyone's way. All night, our Producer asks very nicely if people wouldn't mind parking to the side and walking the extra 300 feet back to their apartments (at the absolute farthest). All is well until about 2:30AM when some drunk twenty-somethings come home in their red Ford Explorer. Again, our Producer asks if they wouldn't mind parking to the side, and they rudely say no, they are going through to the very end. That's fine if you're a prick. But as we see the car coming towards us, they verbally threaten to start hitting our gear with their SUV. They speed up and slam on their brakes right before some of our lighting gear, finally go around it (before we've even had the chance to move the gear for them). I can only assume some racial slurs were spoken to our African-American producer, as he threw down his papers and the slate and started storming over to the now-parked SUV. The two guys, obviously drunk, get out and start walking towards the Producer as they mouth off at him, and 4 of the other black guys on set race over to stop our Producer in his tracks... though he still presses forward.

I'm a stereotypical Italian male in that when I'm nice, I'm extremely pleasant... when I'm angry, stay away from me if I go quiet. The two guys who got out of the SUV were pretty big... I won't lie... but I'm a big guy myself. While not having any spare time for bullshit, I grab a gobo arm and begin walking towards the group with the gobo arm as a "Hey, leave here right now if you don't want the words Century Stands imprinted in your ass" walking cane. The driver, the one mouthing off and nearly destroying our equipment, is quickly appologetic to 5 paticularly large gentlemen who are sleep deprived, but the passenger stands strong, obviously wanting some new dental work.

We calm our producer down and those idiots go into their apartment and we continue shooting.

We finish up all of the MCU and CU exterior stopped car stuff, and while most of the team breaks for lunch, some of us guys go to figure out the car mount. It was actually a lot easier than I thought it would be. We did a test fittament and then began working on the interior car lighting scheme.

For some reason, we didn't opt to get any of the 1 foot Kino banks to throw on the dash for some illumination, but then tried to fake it with some crappy neon lights we got from Auto Zone. They failed miserably... we ended up gelling the interior dome lights and map lights for the scene. It was dark as hell, but we can bring up the mid tones in post.

The genius I had described before comes now. I wanted to find a way to light the background ever so slightly as the car was driving by... looking like a uniform moonlight. Knowing the interior lighting availabilty, it needed to be relatively low-key.

The car we shot in had a sunroof. We MacGuiver'ed a rig to attach to the half open sunroof with a duckbill clamp, the knob off a gobo head and a towel to insure we didn't scratch the glass. From the top of that arm, we placed the 4-Bank Kino, facing directly past the passenger side of the car (the car mount was first on the driver's side). We lit only one bulb, but managed to plug the Kino into a 300 watt cigarette lighter AC/DC adapter. It looked freaking amazing... and everyone who was there shook my hand for it. Hell, I even impressed myself. It doesn't even look like we hung 2 or 3 AIRSTAR balloons 60 feet in the air to hit the trees in the background... it looks like low-key, consistant moonlight.

At the end of the night, and with one shot to go, the adapter plate and new 50mm f1.4 lens took a dive. It was extremely dark outside and in the midst of the AC attaching it back to the camera (after we thought we were wrapped), it fell and hit the pavement. The lens was the AC's, but the adapter plate was someone elses... and now the production has to pay for it. It's still in working condition, but you can very seriously tell that we dropped it. I was extremely saddened by this, as I had gotten this piece as a favor from a friend.

At 7:30AM, we finally returned the generator for its one day rental... and at 8:00AM this morning, I finally went to bed.

When I get them, I'll post BTS photos of the car rig and shots from the camera.
 
Last edited:
Get information. Sounds like you're having some serious challenges but it sounds like some things are going good at least. Can't wait for the BTS photos.
 
Some frame grabs... these aren't the impressive ones...

Emotions26.jpg


Emotions25.jpg


Emotions24.jpg


Emotions23.jpg


Emotions22.jpg


Emotions21.jpg
 
Sounds trying. Hopefully it will smooth out soon. Some good reminders in your post. Those frames grabs look good, looking forward to seeing more and some BTS shots, in due course.
 
To all you tech-heads out there... we shot in 24P mode (F5 setting) but I imported these stills interlaced in FCP. My own fault.
 
I love your day-to-day diaries, from your previous film and this one. Always detailed and full of information, backed up by wonderful images, allowing me to picture the sets you're on.
I've learned alot of behinds the scenes gems regarding equipment, setting up, and trials and errors.

Thankyou, and good luck with the rest of the shooting.

PS I did wonder about the interlacing..;-)
 
Last edited:
Thanks. Sometimes I get really frustrated and then I read stuff like this and realize that I haven't earned the right to go postal, although one time I accidentally dropped a motorized grid on a set piece....oops. It's a great credit to you that you care so much. Keep it coming and Rock On.
 
Bump, because this is an awesome thread and not some ridiculous I'm mad at technology for being challenging thread or why can't P2 save my relationship. Word.
 
Haha, sweet.

An update for those interested:

I've got a meeting in the next few days on how and where and when we are to do our two days of pick-ups. I'll also be asking the Director for the captured footage so that I can post a crap-ton more stills!
 
Emotions209.jpg




And no, this is 2.35 (technically 2.40) : 1. This way, most of my demo reel will match up and the letterboxing won't be a distraction for potential viewers.
 
Back
Top