I have a project, 2/3 of which is on an SD 23.976 timeline. The final 1/3 is on a HD/60i timeline. I don't mine bringing the HD resolution down to SD. But I obviously need to get the framerates to be the same for both part of the project. I believe I'll get the best result by converting the 23.976 to 29.97 and then bringing it into the 60i timeline. But I'm not sure what method I should use to accomplish this? I cannot easily add a Timewarp "insert pulldown" because the project is already edited, and Timewarp can't be added on top. Unless I step into every segment and add the Timewarp effect?
Last edited: