uh oh, accidently captured some footage at 29.97 for a 24p project. Solution?

JCVR

Well-known member
I have no idea how it happened, but a somewhat small scene got captured at 29i for a 24p timeline project (DVX footage and 16mm). What is my best option going to be to deinterlace and simulate the framerate? oh jeez, what a bummer.
 
Try slowing down the 29.97 footage by 25%. Then take the audio into an audio program like protools and chop it into segments and time stretch it so that the pitch is preserved.
 
Back
Top