JonathanLB
Carbonite Member
Well in late February this project started its pre-planning and idea phase. I had wanted to do a rooftop shoot for a while, but only with a concept that could make it original, i.e. there are lots of rooftop music videos and it has to have something new about it to me otherwise I feel like I'm re-inventing the wheel basically. I had this concept where day and night performance footage would switch between one another for a song that expressed some sort of emotional turmoil, or indecision, or even a "good times, bad times" song, where you could fit the concept with the lyrics in a way that made sense. Then I added a story to that concept and that location and came up with this video for a song titled "Winded" by a band called Rockchild.
You can see the credit list at the end of the video so I don't need to say too much there I guess, but I had a great team, a really professional DP (I think it was his 25th music video), and just a great attitude from everyone on set. I really felt like we had a team atmosphere where people were excited by what we were doing. Pre-production was a nightmare, we switched locations once, went through some concept changes, switched DPs once as well (and I love my DP for this project, can't wait to work with him again), actress didn't respond to numerous calls and e-mails before the shoot so I had to replace her the day before (and got a gorgeous lead anyway, I think this girl turned out better anyway), one grip (who helped on my last music video) was stranded in Chicago because of airline cancelations, canceled 9:15 p.m. the night before so we filmed short a grip. Actually originally we wanted 6 people in the grip / electric department, but we had 4. Somehow, we were still 45 minutes ahead of schedule! Unheard of for a shoot in my experience. It was very tight early in the day during story stuff, we had no time to spare, but we finished the night performance 50 minutes early (permit ran until 10 p.m. and we finished at 9:10) because we already had everything setup from the day performance. Shoot was about 11 a.m. (call time) to just past midnight but we didn't get everyone out of there until about 1:30 a.m.
Editing was a nightmare too, I started to lose a bit of patience at times with the miniscule changes the band wanted, but that happens a lot. They are a good group of guys. It's just the editing room can be tough because I see my job as making the musicians happy, yet I'm the director so ultimately I have to make calls that I think make sense for the video. Ultimately it's such a collaborative process and it's so time-consuming that it's understandable there are tense moments. In the end I think that leads to a better video, though, and I hope the band is happy with it. I think they are now! I worked on this with my editor (and later the band) on 17.5 hours Sunday, 1 p.m. through 7:30 a.m. On Sunday another 10 hours doing final coloring (we had tinkered but the cuts had to be locked down of course before the final), DVD creation, exports for the Web, etc. I spent Friday finishing the wrap book, which was about 175 pages long full of contracts, documents, etc. That's not the fun part but you can never be too organized or careful with that kind of thing.
The link I'm posting has four versions, by the way, the first is the finished version with credits added (for festival submissions, fun, etc.). The official version has no end credits, of course, as music videos don't. It was just fun to give everyone some credit. The behind-the-scenes video also might be fun for you guys to watch, but I wouldn't recommend the day and night versions we put there (performance only versions) unless you really have time to kill. They are just for fun, the editing is a LOT more rough than the final version, I'm sure there are all kinds of not-perfect shots or cuts that are 2-3 frames off, they still both look good to my eyes, and we did work on them, but come on, we can't put 20 hours into just "for fun" cuts.
Without further verbage...
http://www.shutzi.com/rockchild/
Oh yeah, any questions just ask of course, but someone will ask. Stock lenses. DP didn't want to use lens adapter, wasn't worth the light loss I guess in the night scenes, and if we didn't use them at night I think both DPs I had aboard this project at one point said it might be strange to have lens adapters on part but not all. I do own a RedRock M2 adapter and 35mm lenses, but not two. The B camera operator on this video, by the way, is a very good director. He's a commercial director and has done several fairly decent budget music videos, he's way more experienced than me so it was kind of neat having him aboard.
You can see the credit list at the end of the video so I don't need to say too much there I guess, but I had a great team, a really professional DP (I think it was his 25th music video), and just a great attitude from everyone on set. I really felt like we had a team atmosphere where people were excited by what we were doing. Pre-production was a nightmare, we switched locations once, went through some concept changes, switched DPs once as well (and I love my DP for this project, can't wait to work with him again), actress didn't respond to numerous calls and e-mails before the shoot so I had to replace her the day before (and got a gorgeous lead anyway, I think this girl turned out better anyway), one grip (who helped on my last music video) was stranded in Chicago because of airline cancelations, canceled 9:15 p.m. the night before so we filmed short a grip. Actually originally we wanted 6 people in the grip / electric department, but we had 4. Somehow, we were still 45 minutes ahead of schedule! Unheard of for a shoot in my experience. It was very tight early in the day during story stuff, we had no time to spare, but we finished the night performance 50 minutes early (permit ran until 10 p.m. and we finished at 9:10) because we already had everything setup from the day performance. Shoot was about 11 a.m. (call time) to just past midnight but we didn't get everyone out of there until about 1:30 a.m.
Editing was a nightmare too, I started to lose a bit of patience at times with the miniscule changes the band wanted, but that happens a lot. They are a good group of guys. It's just the editing room can be tough because I see my job as making the musicians happy, yet I'm the director so ultimately I have to make calls that I think make sense for the video. Ultimately it's such a collaborative process and it's so time-consuming that it's understandable there are tense moments. In the end I think that leads to a better video, though, and I hope the band is happy with it. I think they are now! I worked on this with my editor (and later the band) on 17.5 hours Sunday, 1 p.m. through 7:30 a.m. On Sunday another 10 hours doing final coloring (we had tinkered but the cuts had to be locked down of course before the final), DVD creation, exports for the Web, etc. I spent Friday finishing the wrap book, which was about 175 pages long full of contracts, documents, etc. That's not the fun part but you can never be too organized or careful with that kind of thing.
The link I'm posting has four versions, by the way, the first is the finished version with credits added (for festival submissions, fun, etc.). The official version has no end credits, of course, as music videos don't. It was just fun to give everyone some credit. The behind-the-scenes video also might be fun for you guys to watch, but I wouldn't recommend the day and night versions we put there (performance only versions) unless you really have time to kill. They are just for fun, the editing is a LOT more rough than the final version, I'm sure there are all kinds of not-perfect shots or cuts that are 2-3 frames off, they still both look good to my eyes, and we did work on them, but come on, we can't put 20 hours into just "for fun" cuts.
Without further verbage...
http://www.shutzi.com/rockchild/
Oh yeah, any questions just ask of course, but someone will ask. Stock lenses. DP didn't want to use lens adapter, wasn't worth the light loss I guess in the night scenes, and if we didn't use them at night I think both DPs I had aboard this project at one point said it might be strange to have lens adapters on part but not all. I do own a RedRock M2 adapter and 35mm lenses, but not two. The B camera operator on this video, by the way, is a very good director. He's a commercial director and has done several fairly decent budget music videos, he's way more experienced than me so it was kind of neat having him aboard.
Last edited: