Edited 24pA footage in 29.97 timeline But...
Wanted it actually 24p.
Do i have to re-edit in a 24p timeline, or can i save the 29.97 project as an mpeg and remove the frames in cinema tools?
Any other sugestions? (What if I were to paste the clips into a 24p time line and hit Tools- Remove Advanced Pulldown)
Thanks.
Wanted it actually 24p.
Do i have to re-edit in a 24p timeline, or can i save the 29.97 project as an mpeg and remove the frames in cinema tools?
Any other sugestions? (What if I were to paste the clips into a 24p time line and hit Tools- Remove Advanced Pulldown)
Thanks.