RyanT
Veteran
Hey guys,
I figured it'd be fun to have a little production diary type thing of this new film I'm shooting.
Here's a little logline about the story:
After his arm is broken by a bully, a love struck kid decides to beat him and impress his schoolyard crush all with one big game of marbles.
We're shooting in Danville, CA at this nice school we've found called Montair Elementary. The reason we picked it was because it had some nice big blacktop areas, the play structures actually had tanbark under them (something that's difficult to find these days), and they had these things called "gaga ball" courts, which we plan on staging all of the marble games in. Here a few location photos so you can get the idea...
We're planning on shooting on the RED with a small set of superspeeds. There are certain montage sequences where we've opted to ditch the red and run 2 or 3 7d's to increase the amount of coverage we can get. With only 2 days to shoot and having a cast of all kids, it's really the only way we can get done on time.
As far as lighting goes, we're planning to keep things pretty simple, using mostly natural light, supplementing it with 6x6 bounces and 4x4 shiney boards through frames of diffusion. We'll also probably have 1 1200 HMI fresnel on hand to put a little fill on the actors here and there. We've spent a good deal of time scheduling everything out so that we'll always be shooting at the optimal times and all the kids will always look their best.
Another fun aspect of this project is that it's being produced along with a local community college, so we have a lot of students coming on and helping out as 2nd AC's, camera pa's, grips, 2nd AD's...you get the idea. They get to learn something, we get a little bit of extra help, so everyone sorta wins.
The other day we went out and shot some very very crude picture storyboards. I'll see if I can't get that up here a little later, as it's basically the movie all shot and cut together.
Anyways, I'm sure I'll have more for you guys soon.
I figured it'd be fun to have a little production diary type thing of this new film I'm shooting.
Here's a little logline about the story:
After his arm is broken by a bully, a love struck kid decides to beat him and impress his schoolyard crush all with one big game of marbles.
We're shooting in Danville, CA at this nice school we've found called Montair Elementary. The reason we picked it was because it had some nice big blacktop areas, the play structures actually had tanbark under them (something that's difficult to find these days), and they had these things called "gaga ball" courts, which we plan on staging all of the marble games in. Here a few location photos so you can get the idea...
We're planning on shooting on the RED with a small set of superspeeds. There are certain montage sequences where we've opted to ditch the red and run 2 or 3 7d's to increase the amount of coverage we can get. With only 2 days to shoot and having a cast of all kids, it's really the only way we can get done on time.
As far as lighting goes, we're planning to keep things pretty simple, using mostly natural light, supplementing it with 6x6 bounces and 4x4 shiney boards through frames of diffusion. We'll also probably have 1 1200 HMI fresnel on hand to put a little fill on the actors here and there. We've spent a good deal of time scheduling everything out so that we'll always be shooting at the optimal times and all the kids will always look their best.
Another fun aspect of this project is that it's being produced along with a local community college, so we have a lot of students coming on and helping out as 2nd AC's, camera pa's, grips, 2nd AD's...you get the idea. They get to learn something, we get a little bit of extra help, so everyone sorta wins.
The other day we went out and shot some very very crude picture storyboards. I'll see if I can't get that up here a little later, as it's basically the movie all shot and cut together.
Anyways, I'm sure I'll have more for you guys soon.