MDKfilms
Well-known member
Well, this is the feature I shot last year in September here in Montreal. 24 days of hell, but I hope it will be well received. It was a small crew, and when I say small it was me Cinematographer, my 1st Ac, a grip/electro, and some PA's that came and went. We were lucky enough to have Bryan Day as production sound. Go and IMDB his name then you will see why me and the director were lucky to get him. A little about production,
Average setups per day = 30
Lighting kit = 5 1.2 pars + 4 Kino 4x4 + 2 Kino 2x4, thats it!
Average travel per day = 100km.
Well here is the trailer, the post is almost finished. Give it a look. Thanks.
http://www.douglasjohnkropla.com/inthebag.html
Average setups per day = 30
Lighting kit = 5 1.2 pars + 4 Kino 4x4 + 2 Kino 2x4, thats it!
Average travel per day = 100km.
Well here is the trailer, the post is almost finished. Give it a look. Thanks.
http://www.douglasjohnkropla.com/inthebag.html
Last edited: