LAfilmaker
Active member
I am doing a project and due to lack of hard drive space I am forced to edit in 5 different projects, export, clean the drive then load all five into a sequence for final export.
The thing that worries me is if the person I am doing the project for wants to make a change at the last minute I am basically screwed because I would have to recapture and assemle again.
Will the EDL thing help me out in this. Is there a way that the EDL would streamline the process of recaputuring and assembling in this situation? If so how?
THanks everyone!!
The thing that worries me is if the person I am doing the project for wants to make a change at the last minute I am basically screwed because I would have to recapture and assemle again.
Will the EDL thing help me out in this. Is there a way that the EDL would streamline the process of recaputuring and assembling in this situation? If so how?
THanks everyone!!