Wondering if anyone can help us out.
Here is the problem.
My friend shoot a feature on Mini-DV on a DVX-100 in 24p. It was later edited on a PC AVID Media Composer in a project timeline at 23.97.
They did the online on a AVID Symphony and Adrenaline where they had some pulldown and drop frame/non-drop frame problems that were later fixed. And now they have a final product on three separate exterior hard drives, ready to be layered unto 120 minutes BETA Digital tapes but the AVID or the deck doesn't want to read it.
They also want to put them unto HD CAM Sr tapes. Suggestions?
Is it as simple as creating another timeline sequence at 29.97, cut and past the project into the new sequence and render?
remember it's a feature, 90minutes, wth colour correction and some SFX lots of rendering
Love some imput!
Thanx!
C
Here is the problem.
My friend shoot a feature on Mini-DV on a DVX-100 in 24p. It was later edited on a PC AVID Media Composer in a project timeline at 23.97.
They did the online on a AVID Symphony and Adrenaline where they had some pulldown and drop frame/non-drop frame problems that were later fixed. And now they have a final product on three separate exterior hard drives, ready to be layered unto 120 minutes BETA Digital tapes but the AVID or the deck doesn't want to read it.
They also want to put them unto HD CAM Sr tapes. Suggestions?
Is it as simple as creating another timeline sequence at 29.97, cut and past the project into the new sequence and render?
remember it's a feature, 90minutes, wth colour correction and some SFX lots of rendering
Love some imput!
Thanx!
C