Erik Naso
Veteran
I have a 23.97 project shot and edited in 23.97 in Final Cut that needs to be 29.97 for broadcast. What is the best method for conversion?.
I used compressor and changed the frame rate to 29.97 and in Frame Controls changed Rate Conversion to Best and Duration to 100.000%.
Does this look like a good workflow?
I used compressor and changed the frame rate to 29.97 and in Frame Controls changed Rate Conversion to Best and Duration to 100.000%.
Does this look like a good workflow?