Matthew Bennett
Well-known member
Thx Matthew. It doesn´t come fast. What do you think is the best workflow for, let´s say, about 20 Clips? First cut in Premiere Pro then render out as 1 file (TGA, QT-Animation...) for the fix in AE. Or first preparing each single clip in AE...?
My own personal workflow (cause I'm on apple)...I first take all my d90 clips, convert them to a 720p prores file, (in AE), and then cut that file in FCP. Then I take my edited prores file, and bring that back into AE, then do the laborious render of the stairstep fix to only the edit.. then I can do a 'once over' grade, etc...
The thing is if you're converting at any point, THEN bringing back into AE, you want to convert everything into another file type but maintain EXACTLY the same pixels in the same positions as they are in the original AVI file.. otherwise the stair step project wont work 'cause it's cutting it at different points and the whole thing becomes a mess..
Or you could just go clip by clip, but what a pain.. so time consuming...