hecklenjeckle
Member
i'm new to the HD realm, and certainly new to P2 files. i am working on a MACPRO, ingesting from P2's on an aj-pdc20 using P2CMS, and then importing those files into FCP. it seems that on files smaller than the 4.06 GB clips, when i drag the clips onto my timeline, there is always an extra frame on the audio clips, which must then be trimmed before the next clip can be placed down and synched with its audio, not to mention the video and audio are not linked up when i drag them onto the timeline, regardless of their file size. can anyone explain this? why is this extra frame here and is there a simpler way to bring my clips into the timeline with the video and audio already linked to avoid this situation. the process of linking everything together to watch dallies has become very tedious. especially when i have a hundred some odd clips at the end of one days work. i am still waiting for my hvx200 handbook by barry green to arrive so any helpful hint would be most appreciated.
Last edited: