UniversalMonster
New member
I know there have been alot of posts about working with 24p mode but I was unable to find anything about working with multiple frame rates in the same project.
Not sure if this is possible.
What I have done is shot footage in 24p mode brought it in to premiere using the default capture settings of 23.97.
I have some additional footage shot at 29.97 that i want to cut into the project but not sure how to go about it. If I work on a 24p timeline the 29.97 footage doesnt work. If I work on a 29.97 timeline the 24p footage flickers.
My ultimate format is for broadcast at 29.97. Any point in the right direction would be greatly appreciated. thanks.
Not sure if this is possible.
What I have done is shot footage in 24p mode brought it in to premiere using the default capture settings of 23.97.
I have some additional footage shot at 29.97 that i want to cut into the project but not sure how to go about it. If I work on a 24p timeline the 29.97 footage doesnt work. If I work on a 29.97 timeline the 24p footage flickers.
My ultimate format is for broadcast at 29.97. Any point in the right direction would be greatly appreciated. thanks.