khmuse
Tech Guru
Hello fellow dvxusers,
I have been asked to DP a job for a fellow dvxuser (tommyinla) entitled "Maliboo". This is Tom's first real project so he is a little bit behind in handling the crew details, so as DP I am jumping in to assist on this aspect as well.
Here are the details.
Its a single location project (which will double as two locations) with a TRT of 10 - 12 minutes. The story is a dark in tone but has its moments of humor as well. We will likely be shooting on the SDX900 and I have called for a decent grip and lighting package. The location is in Encino CA. Crew call times would be about 4PM on Friday (with a wrap around 11PM). 8 AM on Saturday (with an 8 PM wrap) and 10 AM on Sunday (with a 10 PM wrap).
The areas that we could use additional crew members for are:
1st AC
1st AD *
Gaffer / Key Grip **
Boom op ***
1 or 2 PAs (those that have some on set experience)
Please feel free to PM or email me if you are interested. We will be assembling the crew by mid this week so I realize that this is a bit of a last moment notice.
Thanks!
Kevin Halverson
email = kevin.halverson@yahoo.com
---------------------------------------------------------------------
* Update as of 1PM PST, the 1st AD job has been filled.
** Update as of 10-11, the Gaffer / Key Grip job has been filled.
*** Update as of 10-13, the boom op position has been filled excetp for the date of 10-14.
I have been asked to DP a job for a fellow dvxuser (tommyinla) entitled "Maliboo". This is Tom's first real project so he is a little bit behind in handling the crew details, so as DP I am jumping in to assist on this aspect as well.
Here are the details.
Its a single location project (which will double as two locations) with a TRT of 10 - 12 minutes. The story is a dark in tone but has its moments of humor as well. We will likely be shooting on the SDX900 and I have called for a decent grip and lighting package. The location is in Encino CA. Crew call times would be about 4PM on Friday (with a wrap around 11PM). 8 AM on Saturday (with an 8 PM wrap) and 10 AM on Sunday (with a 10 PM wrap).
The areas that we could use additional crew members for are:
1st AC
1st AD *
Gaffer / Key Grip **
Boom op ***
1 or 2 PAs (those that have some on set experience)
Please feel free to PM or email me if you are interested. We will be assembling the crew by mid this week so I realize that this is a bit of a last moment notice.
Thanks!
Kevin Halverson
email = kevin.halverson@yahoo.com
---------------------------------------------------------------------
* Update as of 1PM PST, the 1st AD job has been filled.
** Update as of 10-11, the Gaffer / Key Grip job has been filled.
*** Update as of 10-13, the boom op position has been filled excetp for the date of 10-14.
Last edited: