Staven
Well-known member
So... I've got my 24p advanced project on a 23.98 timeline. My sound guy uses protools that can do 24 frames, not 23.98. My music guy's program does 24 frames not 23.98. How the heck can I achieve sync with my project if I'm 2 frames different every second than my sound guys?
I did try moving my project(feature length 1h35min) into a 24 timeline. Had to render forever, then everything was out of whack.
Help please!
I did try moving my project(feature length 1h35min) into a 24 timeline. Had to render forever, then everything was out of whack.
Help please!