DVX100Shooter
Veteran
So far everything that I have shot and edited on FCP4 has been shot using 24p Normal. However, I want to learn the process of removing the pulldown for a 24p timeline, etc.
Can someone walk me through the process. I hook my camera up via firewire. Now what? I know have to go into my FCP settings and select some things like capture preset, sequence preset, and playback control I am guessing that I select the DV-NTSC Advanced 2:3:3:2 pulldown Then for Sequence - DV NTSC 48Khz-23.98 as well as playback control? I make these selections BEFORE I capture video right?
Okay I have read past posts about people that have had jerky or jittery footage when editing with 24pA. How do I avoid this?
Also is Compressor only to be used if I am using DVD SP? Will it work with iDVD as well?
I have shot some footage in 24p normal mode with custom camera settings. I just imported all that in the computer, If I had set the normal footage to edit in a 23.98 timeline would that screw everything up big time? I left it in a 29.97 but I was just curious.
My next project I want to shoot 24pAdvanced and edit removing the pulldown.
Oh yea the book says you can add the pulldown when your project is finished but doesn't say how to do it. So how do I do that since I am asking a boat load of questions today!
Can someone walk me through the process. I hook my camera up via firewire. Now what? I know have to go into my FCP settings and select some things like capture preset, sequence preset, and playback control I am guessing that I select the DV-NTSC Advanced 2:3:3:2 pulldown Then for Sequence - DV NTSC 48Khz-23.98 as well as playback control? I make these selections BEFORE I capture video right?
Okay I have read past posts about people that have had jerky or jittery footage when editing with 24pA. How do I avoid this?
Also is Compressor only to be used if I am using DVD SP? Will it work with iDVD as well?
I have shot some footage in 24p normal mode with custom camera settings. I just imported all that in the computer, If I had set the normal footage to edit in a 23.98 timeline would that screw everything up big time? I left it in a 29.97 but I was just curious.
My next project I want to shoot 24pAdvanced and edit removing the pulldown.
Oh yea the book says you can add the pulldown when your project is finished but doesn't say how to do it. So how do I do that since I am asking a boat load of questions today!