Production Journal - ''These Days'' - Week 2

KevinZanit

Active member
Hello,

So we just finished up week 2. Week 2 consisted entirely of interior work (except for about 2 hours of day EXT.) in one location.

The scenes were a mix of night and day; we shot in several different parts of a house. Due to several reasons, we shot all of the work at night. Thus, any day scenes were shot night for day.

The location was pretty nice. It was not huge, but not as small as some of the other locations, but we did end up shooting in very small bathrooms, etc.

I think my biggest problem was just getting bored with the same location. Once we dialed in a look for the place, there was not a lot of room for switching things up. Of course, I could make some changes, but generally they had to be subtle.

Another issue was that the director really wanted the ability to look anywhere in a room. Sometimes we had two cameras going that had to be able to look almost anywhere. This was complicated by the fact that we could not use wall spreaders in the location due to the ceiling height, so the big question of the day was where we could put lights. I tried my best the give the director what he wanted, but sometimes I just had to tell him it was not possible to do, especially in a timely manor.

One tricky issue was placing the generator and other trucks (not really my problem, other than the time it takes for the cable run). We were in a residential area, at night, every night for a week thus noise considerations sometimes dictated where we could put stuff. The streets were not very wide, so the generator truck took up over half the street, luckily no one complained much.
01.jpg


We started shooting in a really small bathroom. I needed a day look and a night look.

The day look:
02.jpg

Consisted of a medium sized lighting unit (I honestly can’t remember what it was, either a 1.2k PAR or 2k fresnel) through the frosted window in the bathroom. I then used a 2x1 Kino for some fill. It was a tricky location as it was so small, and we were shooting into a mirror in such an angle that the Kino could only come from a fairly flat place, not the best looking place, but it ended up looking pretty nice. I sometimes just used the mirror to help us cheat a close up when we could not actually get the camera in.

The other look was a night look:
03.jpg

This picture is more contrast-y then the final image, plus the branch and color of the window light was not dialed in yet. But, this was roughly the night look. I just lit the actor at the sink with the bounce back from the Dedo that was armed overhead. I used either a ¼ or ½ (don’t remember) Promist to make the sink glow a little. Out the window was a 2k into bead board with yellow 101 (or something ugly like that).

For a nighttime look in the living room (where we spent most of our time) I used a 10k with ¼ CTO bounced off a 6x6 griff into a large window with curtains (just to glow the curtains):
04.jpg

And then used a 4x4 floppy in the middle of the griff just to break the light up some, because ambient street light (or whatever it is) usually does not perfectly fill a window:
05.jpg

And this is sort of what it looked like:
06.jpg

The truth is the scene really looked nothing like that, but it is the best picture I have. For the two back windows I ended up just bouncing two 1200s with full CTO into a white building next door, and then really netted that down.

For a scene with two characters at a table I used that “night time ambient” look with a Kino coming from a practical’s direction, and a Dedo armed as a backlight motivated from another practical. I then used a wired down 300 into the ceiling for “room tone”, just to bring the room up some. It was a nice low-key night look.
07.jpg


The above pretty much sums up my approach for the night scenes. Ambient light to glow windows, some room tone, a kino or two for key, and sometimes a Dedo backlight. It was fast, and looked nice.

We latter went outside for some daytime park flashbacks. It was quick simple stuff. The girl was supposed to look great. We put the bench she was sitting on against a nice backlit background. I then used a 6x6 Griff and some bounce boards on her. We placed the camera really far and used a long lens to really through the background out of focus.
08.jpg

09.jpg

Then she turned around, and I used a 4x4 frame of grid over head:
10.jpg


We then shot some simple day INT stuff:
11.jpg


I just used a Kino and some negative fill through these scenes. These were also the first scenes with Beth Grant. She is a great actress, and funny.

We finished up the week with one of the most difficult shots I have dealt with. As I said, the director had been really pushing to see as much of the location as possible. For this scene, he wanted to do a 360 dolly move. The move was as follows:
We start at one end of the room, on a very wide lens. An actor walks into frame, walking ahead of camera, towards the other end of the room. We push-in, following behind her. We stop at a couch, as she takes a seat we pan all the way around so that the camera is now looking at the other side of the room (the side we started in) to follow a different actor into a chair. To do the move, we could not use dolly track (as we would see it). Luckily the floor was very smooth. Also, there was a rug and table in the shot that were directly in the way of the dolly path. We could not just take them out, as they had already been established previously. And, when we did the pan around, the dolly grip had to move to the other side of the dolly to continue the move.

So to fix the rug and table problem, someone from art department road on the dolly, and as we got to the problem areas, he would slide them out of the way (they were off camera at this point).

When this move was first proposed I really did not want to do it, and was going to fight it. But, because the scene was a day INT. I knew I could light though the windows, so I decided to agree to it. There could be absolutely no equipment in the room, as we would see it. I could not light from above (for previously stated reasons), thus everything came from the windows.

The scene was shot at about 2am, so it was obviously a night for day situation:
12.jpg


I had a 10k really high up, tilted down through the big window, as well as a 1k VNSP PAR through the same window, but angled in such as way as to light the deeper part of the room. Through the two small windows was a 1.2k PAR through each window with 1000H. The shot worked well, and because most of the room was lit already, the time it took for coverage was very short.

I sometimes just augmented what was there with some negative fill and or a kino:
13.jpg


All and all it was a hard, but good week. We got some real good scenes. My only concern is the amount of coverage we have been getting (a lot). I have been working with the director on trying to cut down the amount of coverage, but it really is just what he wants to do. Thus, there is not a lot I can do. More to come.



Kevin Zanit
 
She is a great actress.

I am not completely sure about how she was cast (the DP is not typically involved in that aspect of production), but as far as I know the director reached her through people who knew her. He sent her a script, she read it, liked it, thus agreed to do it.

The cast is made up of fairly experienced actors. None that are extremely well known, but many are very recognizable due to their large bodies of work.

Kurtwood Smith is also set to be in the project (although I heard rumors a few days ago that he may not be available due to some scheduling issues).

Also, Billy Aaron Brown is in the film (who did a great job).

No one hugely well known, but all working actors.

Kevin Zanit
 
Kevin_Zanit said:
All and all it was a hard, but good week. We got some real good scenes. My only concern is the amount of coverage we have been getting (a lot). I have been working with the director on trying to cut down the amount of coverage, but it really is just what he wants to do. Thus, there is not a lot I can do. More to come.


Thanks for the excellent post and interesting info.

Just curious....do you think the director is shooting way too much coverage and won't be needing it? In other words, wasting shooting days? Don't want you to get in trouble so you may not be able to answer the question.

But any insight to that comment would be most appreciated. Good luck with the rest of the shoot!!!
 
Man thanks for these updates... The thrid if I remember correctly! I look forward to seeing these when the week ends! lol
 
" . . . Just curious....do you think the director is shooting way too much coverage and won't be needing it? In other words, wasting shooting days? Don't want you to get in trouble so you may not be able to answer the question . . . "

I do feel there have been several instances where we were over covering scenes. I look at it this way: You can only use so many shots in one scene; therefore you will end up throwing a lot out. I am just trying to minimize the "waste" to make sure that we do make our day, while giving every other department enough time to do their job right.

I think there are a few reasons that could attribute to this "problem" - One is that the director knows what he wants, but just is not getting it. So we keep shooting because he can not quite communicate what the problem is.

Another reason is just shear nervousness - "Will I be able to cut this scene together properly, so that it is comprehendible?" Thus we keep shooting.

Or a third reason is that the director is having problems with the performances, and thus he wants to/ needs to essentially piece the performance together (this is not really the case on this particular project).

Getting a lot of coverage is not that big a deal if everyone is on the same page and expects it. We now know what to expect from him. Once we know what he wants, we can better serve him. For example, I planned to phase out multiple camera setups because I did not like dealing with the two cameras in the cramped space (plus I generally don't like multiple cameras). But, because of the above reasons, we now use two cameras in almost every setup.

We shoot our master with a single camera. Then for coverage, I will have one operator shooting a "clean" close up, and another shooting an OTS close-up. Once we feel that one of the cameras has got the shot, we just send it off to shoot inserts, and find interesting cut-aways.

Since we have been working together as a crew now for several weeks, we are moving better. This is all a normal progression.

I have worked with the same gaffer for years and years for this reason, I don't need to really explain what I want, we have a shorthand. This develops with all collaborators over time.


Kevin Zanit
 