B BLahey Well-known member Oct 7, 2009 #1 Not sure if this is the right spot, but i need to add about 5 seconds of black before a clip after i knocked off the bars and slate.
Not sure if this is the right spot, but i need to add about 5 seconds of black before a clip after i knocked off the bars and slate.
Justin Kuhn Veteran Oct 9, 2009 #2 I've found you can drop in a separate movie on the track just of the slug. I don't think I had to compress it or anything either.
I've found you can drop in a separate movie on the track just of the slug. I don't think I had to compress it or anything either.
NoahK Hottie Mod Oct 9, 2009 #3 Best done in FCP before going to DVDSP. Otherwise it's a re-encode step for DVDSP. Noah
Jim Brennan VHS Member Old Skool Oct 9, 2009 #4 You can just leave the timeline empty after B&T, or drop in some slug.