maranfilms
Veteran
Yesterday I was on location shooting with two gh4's, I went through both cams to match settings. However, It appears I didn't enable the frame rate on my A cam to match B cam. So basically I ended up shooting one cam at 23.97 and one at 29.97. Yes a stupid amateur mistake I should have never made. I use adobe Premiere CC 2014, Is there a way to convert the 29.97 footage to 23.97 without throwing off audio. I used a zoom h6 at 48k, which technically should work on either? Or am I mistaken? So what would be the best approach?
1. Just drop the mixed footage on a 23.97 time line and export at 23.97? Let premiere try to figure it out
2. Use Twixter or Magic Bullet frames to convert the footage from 29.97 to 23.97?
3. Use the Adobe conform footage feature (doesn't this method just speed it up or slow it down?)
The shutter speed was the same on both cams, Again I know how incredibly stupid It was to let this happen, especially with the monitor displaying the info. WOW!
I'm so mad at myself over this stupid mistake. Any help would be greatly appreciated!!!! THANKS
1. Just drop the mixed footage on a 23.97 time line and export at 23.97? Let premiere try to figure it out
2. Use Twixter or Magic Bullet frames to convert the footage from 29.97 to 23.97?
3. Use the Adobe conform footage feature (doesn't this method just speed it up or slow it down?)
The shutter speed was the same on both cams, Again I know how incredibly stupid It was to let this happen, especially with the monitor displaying the info. WOW!
I'm so mad at myself over this stupid mistake. Any help would be greatly appreciated!!!! THANKS