There are not too many topics on here about multiclip editing. I use this function for nearly every project that I am hired to do. The only problem I have is getting accurate sync. The video is very smooth but the audio cracks at nearly every cut like it is a frame or two off. What is the best way to get the most accurate sync between 3 cameras? By the way, we usually slate once we start recording. We also sync timecodes via firewire but that is just to keep the timecode close because they are always 2 or 3 frames off.