Hello.
I recently got footage of an event captured by three different cameras. The cameras were not continuously recording, so what i have is basically 50-60 clips from each camera that covers a 2 hour timespan.
all the clips have timecode, so i was wondering if there was a decent way to sync them all up in premiere?
I recently got footage of an event captured by three different cameras. The cameras were not continuously recording, so what i have is basically 50-60 clips from each camera that covers a 2 hour timespan.
all the clips have timecode, so i was wondering if there was a decent way to sync them all up in premiere?