Hey all,
Yet another day of lessons learned that I thought I would share.
The background on this shoot is that the project has been going on for more than 2 years now. It's being shot on Super 16MM film, and the director has been fitting days in when his budget and his talent have availability.
For this shoot, we were shooting in both a hotel room and the hotel lobby.
So, here's some things learned on this shoot:
1. If you have to pass a cable under a door, where it might get pinched, use a short/cheap cable. I had to reposition a cable from the open side to the hinge side so I dropped a 1.5 foot cable I had in the door part, and sure enough the cable was ripped apart from hours of opening and closing the door. Only cost the director $5.00 instead of $50.00 or so if I had left my 50 foot canare cable there instead.
2. Man this project has been frustrating from the standpoint of not being able to use new gear. For example, I was running two lavs and a boom and I had to use my G2's instead of using the Lectros just to keep things matched (yes, I know I could have gone with the Lectros anyway, and had better sound, but the director has little or no post sound budget, so the closer I can deliver matching audio to him, the better.) But it really hurts to not to be able to use all of my new toys.
3. If you don't have a boundry mic, get one. I picked up an EV model used, and it saved me on the lobby scene. We had no room for a boom in the shot, so I stuck the EV right on the counter, hid it with the computer mouse and it picked up great sound.
4. This was the first shoot where I actually had to throw away broken gear. First, the cable, and second the director's headphones. He paid for both, but still I feel pretty luck that it has taken this long. (Knocking wood and formica).
Anyway, just a few musings. I'll expand this a bit later.
Phil
Yet another day of lessons learned that I thought I would share.
The background on this shoot is that the project has been going on for more than 2 years now. It's being shot on Super 16MM film, and the director has been fitting days in when his budget and his talent have availability.
For this shoot, we were shooting in both a hotel room and the hotel lobby.
So, here's some things learned on this shoot:
1. If you have to pass a cable under a door, where it might get pinched, use a short/cheap cable. I had to reposition a cable from the open side to the hinge side so I dropped a 1.5 foot cable I had in the door part, and sure enough the cable was ripped apart from hours of opening and closing the door. Only cost the director $5.00 instead of $50.00 or so if I had left my 50 foot canare cable there instead.
2. Man this project has been frustrating from the standpoint of not being able to use new gear. For example, I was running two lavs and a boom and I had to use my G2's instead of using the Lectros just to keep things matched (yes, I know I could have gone with the Lectros anyway, and had better sound, but the director has little or no post sound budget, so the closer I can deliver matching audio to him, the better.) But it really hurts to not to be able to use all of my new toys.
3. If you don't have a boundry mic, get one. I picked up an EV model used, and it saved me on the lobby scene. We had no room for a boom in the shot, so I stuck the EV right on the counter, hid it with the computer mouse and it picked up great sound.
4. This was the first shoot where I actually had to throw away broken gear. First, the cable, and second the director's headphones. He paid for both, but still I feel pretty luck that it has taken this long. (Knocking wood and formica).
Anyway, just a few musings. I'll expand this a bit later.
Phil