Apologies for the following:
- If this has been posted before
- The noobish nature of the question
I have a feature I'm editing, and it has a few different framerates (mostly 24p, but some 60i for slo-mo and even a scene shot in 30p). Now, I'm somewhat familiar with the "interpret footage" tool, but that simply tells the project to play the clip at whatever rate you want, whilst still playing back at the project settings framerate (IE 30p project, interpret a clip at 60i, plays twice as fast).
My question is, how can I have the different rates play truly together on one timeline sequence? If I have a 24p project, and I import a 30p or a 60i clip, the project thinks they're also 24p clips. If I tell the project to interpret them as 30p or 60i, it will treat them as such, but still play them back at 24fps.
I feel like I'm missing something REALLY simple...
- If this has been posted before
- The noobish nature of the question
I have a feature I'm editing, and it has a few different framerates (mostly 24p, but some 60i for slo-mo and even a scene shot in 30p). Now, I'm somewhat familiar with the "interpret footage" tool, but that simply tells the project to play the clip at whatever rate you want, whilst still playing back at the project settings framerate (IE 30p project, interpret a clip at 60i, plays twice as fast).
My question is, how can I have the different rates play truly together on one timeline sequence? If I have a 24p project, and I import a 30p or a 60i clip, the project thinks they're also 24p clips. If I tell the project to interpret them as 30p or 60i, it will treat them as such, but still play them back at 24fps.
I feel like I'm missing something REALLY simple...