Convert 24pn on 29.97 timeline to 23.98 after edit

planetearth

Well-known member
Really need help on this one.

If footage was shot on 24pn (not advanced), then edited (low rez) on 29.97 timeline - is it possible to "Unlink" clips on timeline, then recapture all the clips (at full rez), run those clips through batch process Cinema Tools to remove pull-down. Then move all clips from 29.97 timeline to a 23.98 timeline, unlink, then relink to folder of Cinema tools-processed clips.

Does this make sense and would it work? If not, any suggestions on how to make this work?

Been doing some tests and so far it is not fully working.

Doing this because DVD's (progressive scan) not lookin' so good in 24pn/29.97 interlaced.
 
Back
Top