dylansmith
Well-known member
My current workflow is to trim all clips and put on timeline first, before batch slowing-down the 120p clips on the timeline.
As all the clips are placed side by side, the clip restricts itself to the original length even after being slowed down. As such, I either have to slow it down 1 by 1 (during trimming process) or shift the clips and give empty space before slowing down.
Is there a better way to do this?
As all the clips are placed side by side, the clip restricts itself to the original length even after being slowed down. As such, I either have to slow it down 1 by 1 (during trimming process) or shift the clips and give empty space before slowing down.
Is there a better way to do this?