Reidwriter
Member
I'm in the middle of this indie feature I'm DP'ing. It's a mixed blessing...
anyway, the director gets frustrated with the amount of time I take away from shooting to do lighting and camera setups.
I'm averaging around an hour for load-ins and initial setups at new locations and about 30-40 minutes for significant setup changes at the same location.
Is this too long? I'll use anywhere from 1-5 lights with a few clip lights, depending on a lot of things. Usually the lights need to be gelled, diffussion or ctb etc, and I always have to wrestle with shadows. This is a no budget indie and the locations are who ever would give up space and I'm ending up with a lot of small spaces with white walls which of course equals shadow puppet theatre.
I'm really just getting into this whole world of strict "dping" and I'm wondering what those who are more experienced average time wise.
I would like to take at least twice as long to do more with the lighting, but that's not an option.
anyway, the director gets frustrated with the amount of time I take away from shooting to do lighting and camera setups.
I'm averaging around an hour for load-ins and initial setups at new locations and about 30-40 minutes for significant setup changes at the same location.
Is this too long? I'll use anywhere from 1-5 lights with a few clip lights, depending on a lot of things. Usually the lights need to be gelled, diffussion or ctb etc, and I always have to wrestle with shadows. This is a no budget indie and the locations are who ever would give up space and I'm ending up with a lot of small spaces with white walls which of course equals shadow puppet theatre.
I'm really just getting into this whole world of strict "dping" and I'm wondering what those who are more experienced average time wise.
I would like to take at least twice as long to do more with the lighting, but that's not an option.