Steve Laramie
Veteran
I am DPing a 2 hour long feature and also editing it this summer. The edit will be very standard very few vfx. The director was appalled when I told him the edit would take 2-3 months not including blowing it up to 35mm. Am I out of line here or is that a pretty ambitious deadline as is. Lets also factor in the fact that the film is in indian and i dont speak a word of indian so Ill be looking back and forth with the script. Also what would you charge for this? I am getting 9,000 to film it so I dont want to beat him up to much on the price.