Hey guys, I know there has got to be a ridiculously simple answer to this, but i can't seem to find it.
If I delete a clip from the timeline, I have a gap.... So how do i move ALL of the clips after the gap up to fill it in (without doing them 1 at a time and leaving parts of my sound out of sink)
And by the same thinking, how do I insert a clip into the middle of a load of clips on the timeline without writing over them (so that they all "make space" for my new clip, again, without me moving them 1 by 1)
I have almost finished the greatest film known to human kind. It's my fist DVX project since I bought mine and it's called UNDERBITE - can't wait to show you guys.
Sorry for this dull and simple post.
X
If I delete a clip from the timeline, I have a gap.... So how do i move ALL of the clips after the gap up to fill it in (without doing them 1 at a time and leaving parts of my sound out of sink)
And by the same thinking, how do I insert a clip into the middle of a load of clips on the timeline without writing over them (so that they all "make space" for my new clip, again, without me moving them 1 by 1)
I have almost finished the greatest film known to human kind. It's my fist DVX project since I bought mine and it's called UNDERBITE - can't wait to show you guys.
Sorry for this dull and simple post.
X