Hi all,
I shot 30P knowing I would play back at 25P resulting in slighlt slo-motion, I have cut a full sequence in 30P using FCP. I only slowed the final mov to get the final 25P.
I need to work at 25P somehow? I threw the edit on a 25P sequence but frames are getting skipped therefore keeping the same sequence duration as the 30P sequence?... I need to play back the 25P frame-for-frame on the 30P sequence resulting in a longer sequence dutation???
How do I do this so that the cuts all lengthen proportionately???
I shot 30P knowing I would play back at 25P resulting in slighlt slo-motion, I have cut a full sequence in 30P using FCP. I only slowed the final mov to get the final 25P.
I need to work at 25P somehow? I threw the edit on a 25P sequence but frames are getting skipped therefore keeping the same sequence duration as the 30P sequence?... I need to play back the 25P frame-for-frame on the 30P sequence resulting in a longer sequence dutation???
How do I do this so that the cuts all lengthen proportionately???