drubynum
Active member
I shot a short film at 24PA and imported the footage as low rez photo JPEG so I could save space on my drive. I realized well into the project that I was editing on a 29.97 timeline. Now I want to start recapturing my footage and Media Manager is (rightly) telling me that recapturing with pulldown for a 23.98 timeline will not work, since the edit was done at 29.97. So here's my dilemma: Is there anyway to "conform" this 29.97 timeline to 23.98, so I can recapture the way I want to? Or, can I just go ahead and recapture without the pulldown, keep the timeline at 29.97, export the entire film, then drop the QuickTime into Cinema Tools and make it 23.98? Would that work? Any other ideas? The final output is intended for DVDs to be submitted to film festivals. It most probably won't end up on broadcast so I'm thinking 29.97 is undesirable, no?