My FCP editor is going to render me a full quality MOV of our short (shot in 24pa with pulldown removed during capture), which I intend to load into Vegas (and DVDarchitect).
Does he have to reinsert the 2-3-3-2 pulldown into the MOV file? If so, what are the steps?