24 fps or 29 fps

swiperstopswiping

Well-known member
Is my pulldown working incorrectly on my NLE?? When I export my footage from Premiere Pro 2.0 to a movie file, and then I click on the file with the right side of the mouse, click properties, and then the summary tab at the top, the description of the file is 29 fps instead of 24 fps. Is this what is supposed to be displayed, or am I correct that the pulldown is not occuring. Thanks
 
The pulldown will be removed in a 24p project. When you see the clip properties in a 24p project, you'll see that it's 23.976.
 
So, basically you're saying it's already done automatically in PP2.0, and that i don't have to do anything at all to remove the pulldown?
 
So, basically you're saying it's already done automatically in PP2.0, and that i don't have to do anything at all to remove the pulldown?
That is correct.

If you're trying to export a movie for say the web, and you want it to be 23.976 fps, that can be set using your export settings.

-Kevin
 
Back
Top