As I make this transition from commercial to narrative work, I am running into frame rate / sound sync issues. I am shooting 4KRAW>4KProRes 422HQ on a CD 7Q. In the commercial world (30 fps) I never had issues with sound drift. My director on this new project wants "24FPS". I just shot some prelim interviews with the actors and I have found a noticeable sound drift of about 6 frames over the course of the single 5 minute slug of video. These are my settings:
FS700 video out to SDI= 4KRaw>4096x2160/24P
CD 7Q "sees" 23.98P "in" in the box in upper L corner, Project rate set to 24 (not "follows input")
In Premiere Pro CC in the Project window the clip frame rate reads 24.00, Sequence setting is set to 24fps
Sound is synced at beginning of clip, but the sound is about 6 frames behind by the end of the 4-5 minute clip
Should I be using 23.976 throughout?
FS700 video out to SDI= 4KRaw>4096x2160/24P
CD 7Q "sees" 23.98P "in" in the box in upper L corner, Project rate set to 24 (not "follows input")
In Premiere Pro CC in the Project window the clip frame rate reads 24.00, Sequence setting is set to 24fps
Sound is synced at beginning of clip, but the sound is about 6 frames behind by the end of the 4-5 minute clip
Should I be using 23.976 throughout?