Ralph nixon
Well-known member
Alright I've just captured my first footage into fcp shot in 24pa. I've counted up the frames and I get 24 distinct frames so it seems that pulldown was done correctly but I have one question. It seems in some clips it is the third frame that is removed as part of the pulldown. Should all the following clips also have the third frame dropped or does it vary...say sometimes the third frame, sometimes the second, sometimes the fourth.
When I captured it mostly said "performing advanced pulldown on material" but with a couple clips it did not yet they loaded fine and when I counted the frames I got 24 and that is what it said int he browser also.
Often though the process stops and I get this window that says "capture now was aborted due to break in cadence in vfr/pulldown in the source stream." What does that exactly mean and what can I do about it?
Oh ya I READ THAT STICKY ABOUT 24PA but all that did was CONFUSE me more.
In FCP it has an easy set up of 24p advanced pulldown 2:3:3:2 in the log and capture section so it is that simple yes.
When I captured it mostly said "performing advanced pulldown on material" but with a couple clips it did not yet they loaded fine and when I counted the frames I got 24 and that is what it said int he browser also.
Often though the process stops and I get this window that says "capture now was aborted due to break in cadence in vfr/pulldown in the source stream." What does that exactly mean and what can I do about it?
Oh ya I READ THAT STICKY ABOUT 24PA but all that did was CONFUSE me more.
In FCP it has an easy set up of 24p advanced pulldown 2:3:3:2 in the log and capture section so it is that simple yes.