kevin mcmillan
New member
http://www.risevideo.org/kevin/Rise Productions1/PROJECTS/48E33852-EE4B-11DC-9C2A-000D932F85EE.html
Let me know what you think, I am amazed that it even came together considering all the problems I had. But here it is almost done minus 2 pieces. I could go on for days about problems with exposure problems in the snow, The Jib and dolly becoming unusable from the snow. The fact that I couldn't find a hand grenade anywhere because if 911. Oh ya and the 3ft of snow that fell the night before shooting.
So the grenade is CG, the shots are all tripod or (sigh) hand held:crybaby: and oh ya the morning of the shoot one actress didn't show. so I re-wrote the whole script in less then an hour and this was what was created.
Let me know what you think, I am amazed that it even came together considering all the problems I had. But here it is almost done minus 2 pieces. I could go on for days about problems with exposure problems in the snow, The Jib and dolly becoming unusable from the snow. The fact that I couldn't find a hand grenade anywhere because if 911. Oh ya and the 3ft of snow that fell the night before shooting.
So the grenade is CG, the shots are all tripod or (sigh) hand held:crybaby: and oh ya the morning of the shoot one actress didn't show. so I re-wrote the whole script in less then an hour and this was what was created.