I've captured 24p Advanced footage at 29.97 w/remove advanced pulldown checked. Now I'm attempting to edit in 23.98 sequences and FCP 5 is telling me the footage needs to be rendered.
**However**
When I play my footage in a 29.97 timeline, nothing needs to be rendered, and the clips are still listed as 29.97 footage in the item properties (w/advanced pulldown removed, mind you).
What is going on here? Hmmm. Something I'm missing in Final Cut 5 or with the advance pulldown? Or is this a little Halloween mystery for everyone...
** One point of interest is that when I set my sequence frame rate to 23.98, it appears as a "Custom" frame rate of 23.976.**
**However**
When I play my footage in a 29.97 timeline, nothing needs to be rendered, and the clips are still listed as 29.97 footage in the item properties (w/advanced pulldown removed, mind you).
What is going on here? Hmmm. Something I'm missing in Final Cut 5 or with the advance pulldown? Or is this a little Halloween mystery for everyone...
** One point of interest is that when I set my sequence frame rate to 23.98, it appears as a "Custom" frame rate of 23.976.**