CaptainMench
11-09-2004, 06:41 PM
Is there a way to "slip" using a FCP/Avid term a video layer?
I've got LOTS of video in one layer. Let's say the clip I loaded is one minute. I need 10 seconds. Here's what I've been doing...
Drop it in at the playhead thingie
Find my in point
Split the clip
Delete unwanted clip
Find out point
Split the clip
Delete unwanted clip
Ok - So is there a better way?
Then, if I want to change that 10 seconds to another 10 seconds in the same loaded clip how do I do that?
Thanks for the help.
CaptM
I've got LOTS of video in one layer. Let's say the clip I loaded is one minute. I need 10 seconds. Here's what I've been doing...
Drop it in at the playhead thingie
Find my in point
Split the clip
Delete unwanted clip
Find out point
Split the clip
Delete unwanted clip
Ok - So is there a better way?
Then, if I want to change that 10 seconds to another 10 seconds in the same loaded clip how do I do that?
Thanks for the help.
CaptM